Fap 385 over Sr385 EB / Progress RD
Fair Condition21 years old18,545 vehicles/day
Location
| State | Tennessee |
| County | Shelby |
| Location | 0.7 Mi East Of Sr-86 Jct. |
| Carries | Fap 385 |
| Crosses | Sr385 EB / Progress RD |
| Coordinates | 35.02740, -89.64858 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 211.0 ft (64.3 m) |
| Max Span | 113.8 ft (34.7 m) |
| Deck Width | 56.1 ft (17.1 m) |
| Deck Area | 1099.5 sq m |
| Main Spans | 3 |
| Year Built | 2005 |
Traffic
| Avg Daily Traffic | 18,545 (2021) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 225 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 79SR3850085 |