Fap 3 over Indian CR Drainage Canal

Poor Condition102 years old16,405 vehicles/day

Location

StateTennessee
CountyTipton
Location.43 Mi.ne.of Brighton
CarriesFap 3
CrossesIndian CR Drainage Canal
Coordinates35.49681, -89.72211

Condition Ratings

Overall ConditionPoor
Deck6 (Satisfactory)
Superstructure4 (Poor)
Substructure6 (Satisfactory)
Channel/Waterway5 (Fair)
Scour Critical3 — Scour critical

Physical Characteristics

MaterialConcrete
DesignTee Beam
Total Length53.1 ft (16.2 m)
Max Span53.1 ft (16.2 m)
Deck Width34.4 ft (10.5 m)
Deck Area170.1 sq m
Main Spans1
Year Built1924 (reconstructed 1958)

Traffic

Avg Daily Traffic16,405 (2021)
Truck Traffic9%
Lanes On Bridge2

Inspection & Ownership

Last Inspection424
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number84SR0030009

Nearby Bridges