IH 30 N Fr over Big Creek Relief

Fair Condition63 years old319 vehicles/day

Location

StateTexas
CountyFranklin
Location3.5 Mi W Of SH 37
CarriesIH 30 N Fr
CrossesBig Creek Relief
Coordinates33.16582, -95.29493

Condition Ratings

Overall ConditionFair
Channel/Waterway6 (Satisfactory)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length23.0 ft (7 m)
Max Span6.9 ft (2.1 m)
Deck Width33.1 ft (10.1 m)
Deck Area70.7 sq m
Main Spans3
Year Built1963

Traffic

Avg Daily Traffic319 (2023)
Truck Traffic7%
Lanes On Bridge2

Inspection & Ownership

Last Inspection125
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number010810061002009

Nearby Bridges