US 75 NB Ent Ramp over Row
Good Condition4 years old7,050 vehicles/day
Location
| State | Texas |
| County | Grayson |
| Location | 2.3 Mi S Of US 82 |
| Carries | US 75 NB Ent Ramp |
| Crosses | Row |
| Coordinates | 33.63798, -96.61627 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 534.8 ft (163 m) |
| Max Span | 107.0 ft (32.6 m) |
| Deck Width | 27.9 ft (8.5 m) |
| Deck Area | 1385.5 sq m |
| Main Spans | 5 |
| Year Built | 2022 |
Traffic
| Avg Daily Traffic | 7,050 (2020) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 010920004702692 |