FM 79 over Pine Creek Relief
Good Condition72 years old2,180 vehicles/day
Location
| State | Texas |
| County | Lamar |
| Location | 0.9 Mi S Of FM 1500 |
| Carries | FM 79 |
| Crosses | Pine Creek Relief |
| Coordinates | 33.71239, -95.63108 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 7 (Good) |
| Culvert | 7 (Good) |
| Scour Critical | 6 — Scour calculated, stable |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 32.2 ft (9.8 m) |
| Max Span | 5.9 ft (1.8 m) |
| Deck Width | 41.7 ft (12.7 m) |
| Deck Area | 124.5 sq m |
| Main Spans | 5 |
| Year Built | 1954 (reconstructed 1971) |
Traffic
| Avg Daily Traffic | 2,180 (2020) |
| Truck Traffic | 14% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 011390068802025 |