FM 2580 over Brazos Riv/e El Camino R

Fair Condition47 years old3,066 vehicles/day

Location

StateTexas
CountyParker
Location8.5 Mi N Of FM 4
CarriesFM 2580
CrossesBrazos Riv/e El Camino R
Coordinates32.57613, -97.82150

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length757.9 ft (231 m)
Max Span91.9 ft (28 m)
Deck Width38.1 ft (11.6 m)
Deck Area2679.6 sq m
Main Spans7
Year Built1979

Traffic

Avg Daily Traffic3,066 (2023)
Truck Traffic8%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last InspectionDecember 2022
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number021840160102008

Nearby Bridges