IH 820 Sbfr over Calloway Branch

Fair Condition59 years old4,056 vehicles/day

Location

StateTexas
CountyTarrant
Location0.5 Mi N Of SH 10
CarriesIH 820 Sbfr
CrossesCalloway Branch
Coordinates32.81684, -97.20689

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignStringer/Multi-beam
Total Length120.1 ft (36.6 m)
Max Span39.0 ft (11.9 m)
Deck Width36.4 ft (11.1 m)
Deck Area406.3 sq m
Main Spans3
Year Built1967

Traffic

Avg Daily Traffic4,056 (2022)
Truck Traffic4%
Lanes On Bridge2

Inspection & Ownership

Last Inspection524
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number022200000813174

Nearby Bridges