SH 121/183 WB Gp over Bedford Road

Good Condition13 years old75,300 vehicles/day

Location

StateTexas
CountyTarrant
Location2.0 Mi E Of FM 3029
CarriesSH 121/183 WB Gp
CrossesBedford Road
Coordinates32.83926, -97.15000

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure8 (Very Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length317.9 ft (96.9 m)
Max Span110.9 ft (33.8 m)
Deck Width74.8 ft (22.8 m)
Deck Area2209.3 sq m
Main Spans3
Year Built2013

Traffic

Avg Daily Traffic75,300 (2010)
Truck Traffic5%
Lanes On Bridge4
Lanes Under Bridge7

Inspection & Ownership

Last Inspection422
Inspection FrequencyEvery 48 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number022200036401687

Nearby Bridges