Pipeline RD South over Trib. To W. Fork Trin

Good Condition14 years old1,400 vehicles/day

Location

StateTexas
CountyTarrant
Location0.1 Mi W Of American BLVD
CarriesPipeline RD South
CrossesTrib. To W. Fork Trin
Coordinates32.82254, -97.07353

Condition Ratings

Overall ConditionGood
Channel/Waterway6 (Satisfactory)
Culvert7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length26.9 ft (8.2 m)
Max Span12.1 ft (3.7 m)
Deck Width45.9 ft (14 m)
Deck Area114.8 sq m
Main Spans2
Year Built2012

Traffic

Avg Daily Traffic1,400 (2016)
Truck Traffic20%
Lanes On Bridge2

Inspection & Ownership

Last Inspection424
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number022200ZP5420004

Nearby Bridges