US 287 over East Jones Creek Trib
Fair Condition54 years old2,950 vehicles/day
Location
| State | Texas |
| County | Montague |
| Location | 0.3 Mi S Of SH 101 |
| Carries | US 287 |
| Crosses | East Jones Creek Trib |
| Coordinates | 33.53530, -97.83328 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 32.2 ft (9.8 m) |
| Max Span | 6.9 ft (2.1 m) |
| Deck Area | 304.8 sq m |
| Main Spans | 3 |
| Year Built | 1972 |
Traffic
| Avg Daily Traffic | 2,950 (2010) |
| Truck Traffic | 26% |
| Lanes On Bridge | 6 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 031690001305040 |