RM 2400 over Big Canyon
Fair Condition65 years old56 vehicles/day
Location
| State | Texas |
| County | Terrell |
| Location | 4.8 Mi E Of RM 2886 |
| Carries | RM 2400 |
| Crosses | Big Canyon |
| Coordinates | 30.39069, -102.23273 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Slab |
| Total Length | 250.0 ft (76.2 m) |
| Max Span | 24.9 ft (7.6 m) |
| Deck Width | 25.3 ft (7.7 m) |
| Deck Area | 586.7 sq m |
| Main Spans | 10 |
| Year Built | 1961 |
Traffic
| Avg Daily Traffic | 56 (2022) |
| Truck Traffic | 14% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 062220229702001 |