State Route 1 NB over Iris Canyon Road

Good Condition58 years old28,000 vehicles/day

Location

StateCalifornia
CountyMonterey
Location05-mon-001-r76.47-mon
CarriesState Route 1 NB
CrossesIris Canyon Road
Coordinates36.58306, -121.89143

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialConcrete Continuous
DesignBox Beam - Multiple
Total Length124.0 ft (37.8 m)
Max Span62.0 ft (18.9 m)
Deck Width39.0 ft (11.9 m)
Deck Area449.8 sq m
Main Spans2
Year Built1968

Traffic

Avg Daily Traffic28,000 (2009)
Truck Traffic3%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last Inspection723
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number44 0192R

Nearby Bridges