Molera RD over SR 1 S1-molera Offramp
Good Condition50 years old2,400 vehicles/day
Location
| State | California |
| County | Monterey |
| Location | 05-mon-001-r90.39 |
| Carries | Molera RD |
| Crosses | SR 1 S1-molera Offramp |
| Coordinates | 36.74614, -121.77184 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 361.9 ft (110.3 m) |
| Max Span | 193.9 ft (59.1 m) |
| Deck Width | 46.9 ft (14.3 m) |
| Deck Area | 1577.3 sq m |
| Main Spans | 2 |
| Year Built | 1976 |
Traffic
| Avg Daily Traffic | 2,400 (2005) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 44 0217 |