Loop 322 over Rainy Creek Relief
Fair Condition63 years old14,376 vehicles/day
Location
| State | Texas |
| County | Taylor |
| Location | 0.75 Mi S Of IH 20 |
| Carries | Loop 322 |
| Crosses | Rainy Creek Relief |
| Coordinates | 32.45210, -99.68315 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 7 (Good) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 68.9 ft (21 m) |
| Max Span | 7.9 ft (2.4 m) |
| Deck Area | 525 sq m |
| Main Spans | 8 |
| Year Built | 1963 (reconstructed 2001) |
Traffic
| Avg Daily Traffic | 14,376 (2023) |
| Truck Traffic | 9% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 082210239801004 |