Natividad Road over Gabilan Creek

Fair Condition55 years old4,200 vehicles/day

Location

StateCalifornia
CountyMonterey
Location0.9 Mi S Old Stage Road
CarriesNatividad Road
CrossesGabilan Creek
Coordinates36.73108, -121.61246

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure7 (Good)
Channel/Waterway6 (Satisfactory)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length82.3 ft (25.1 m)
Max Span32.2 ft (9.8 m)
Deck Width40.7 ft (12.4 m)
Deck Area311.2 sq m
Main Spans3
Year Built1971

Traffic

Avg Daily Traffic4,200 (2017)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number44C0061

Nearby Bridges