Chaparral Road over Trimmier Creek
Good Condition58 years old4,577 vehicles/day
Location
| State | Texas |
| County | Bell |
| Location | 0.50 Mi W Of FM 3481 |
| Carries | Chaparral Road |
| Crosses | Trimmier Creek |
| Coordinates | 31.03507, -97.66500 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 123.0 ft (37.5 m) |
| Max Span | 29.9 ft (9.1 m) |
| Deck Width | 24.6 ft (7.5 m) |
| Deck Area | 281.2 sq m |
| Main Spans | 4 |
| Year Built | 1968 |
Traffic
| Avg Daily Traffic | 4,577 (2020) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 090140AA0572001 |