Murphy Road over Pajaro River

Fair Condition28 years old4,600 vehicles/day

Location

StateCalifornia
CountyMonterey
Location1.2 Km S SR 129
CarriesMurphy Road
CrossesPajaro River
Coordinates36.90573, -121.67661

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure7 (Good)
Channel/Waterway5 (Fair)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length89.2 ft (27.2 m)
Max Span35.1 ft (10.7 m)
Deck Width33.8 ft (10.3 m)
Deck Area280.2 sq m
Main Spans3
Year Built1998

Traffic

Avg Daily Traffic4,600 (2017)
Truck Traffic2%
Lanes On Bridge2

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number44C0178

Nearby Bridges