San Ann Road over Davis Branch
Poor Condition54 years old20 vehicles/day
Location
| State | Texas |
| County | McLennan |
| Location | 1.00 Mi NE Of SH 6 |
| Carries | San Ann Road |
| Crosses | Davis Branch |
| Coordinates | 31.54934, -97.25780 |
Condition Ratings
| Overall Condition | Poor |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 4 (Poor) |
| Channel/Waterway | 4 (Poor) |
| Scour Critical | 4 — Foundations need monitoring |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Other |
| Total Length | 29.9 ft (9.1 m) |
| Max Span | 28.9 ft (8.8 m) |
| Deck Width | 24.0 ft (7.3 m) |
| Deck Area | 66.4 sq m |
| Main Spans | 1 |
| Year Built | 1972 |
Traffic
| Avg Daily Traffic | 20 (2022) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 091610AA0820001 |