Conner ST over Porter Slough

Good Condition80 years old1,725 vehicles/day

Location

StateCalifornia
CountyTulare
Location.3 Mi N Sr190 @success DR
CarriesConner ST
CrossesPorter Slough
Coordinates36.05782, -118.98608

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway9 (Excellent)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length58.1 ft (17.7 m)
Max Span19.0 ft (5.8 m)
Deck Width29.9 ft (9.1 m)
Deck Area161.1 sq m
Main Spans3
Year Built1946

Traffic

Avg Daily Traffic1,725 (1978)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last Inspection225
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number46C0299

Nearby Bridges