SH 3 over Clear Creek Relief
Fair Condition38 years old19,772 vehicles/day
Location
| State | Texas |
| County | Galveston |
| Location | 0.85 Mi NW Of FM 518 |
| Carries | SH 3 |
| Crosses | Clear Creek Relief |
| Coordinates | 29.51849, -95.10130 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 274.9 ft (83.8 m) |
| Max Span | 55.1 ft (16.8 m) |
| Deck Width | 110.9 ft (33.8 m) |
| Deck Area | 2832.4 sq m |
| Main Spans | 5 |
| Year Built | 1988 (reconstructed 1993) |
Traffic
| Avg Daily Traffic | 19,772 (2020) |
| Truck Traffic | 5% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 120850005103047 |