Hogan Crockett ST over IH 10 Ih45 And W Oak Byu
Fair Condition65 years old20,068 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | @ IH 10 & IH 45 |
| Carries | Hogan Crockett ST |
| Crosses | IH 10 Ih45 And W Oak Byu |
| Coordinates | 29.77420, -95.36636 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 980.0 ft (298.7 m) |
| Max Span | 109.9 ft (33.5 m) |
| Deck Width | 53.8 ft (16.4 m) |
| Deck Area | 4898.7 sq m |
| Main Spans | 7 |
| Year Built | 1961 |
Traffic
| Avg Daily Traffic | 20,068 (2019) |
| Truck Traffic | 3% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 22 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 121020027107392 |