Spur 330 EB over Mprr Wade RD Baker RD
Good Condition23 years old14,950 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 2.50 Mi SE Of IH 10 |
| Carries | Spur 330 EB |
| Crosses | Mprr Wade RD Baker RD |
| Coordinates | 29.77295, -95.01601 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 3008.9 ft (917.1 m) |
| Max Span | 120.1 ft (36.6 m) |
| Deck Width | 71.5 ft (21.8 m) |
| Deck Area | 19992.8 sq m |
| Main Spans | 27 |
| Year Built | 2003 |
Traffic
| Avg Daily Traffic | 14,950 (2013) |
| Truck Traffic | 11% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 12 |
Inspection & Ownership
| Last Inspection | November 2022 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 121020050807306 |