SH 249 NB over Perry RD

Fair Condition29 years old70,613 vehicles/day

Location

StateTexas
CountyHarris
Location1.40 Mi NW Of FM 1960
CarriesSH 249 NB
CrossesPerry RD
Coordinates29.97384, -95.56346

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure6 (Satisfactory)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length360.9 ft (110 m)
Max Span124.0 ft (37.8 m)
Deck Width83.3 ft (25.4 m)
Deck Area2,794 sq m
Main Spans3
Year Built1997

Traffic

Avg Daily Traffic70,613 (2023)
Truck Traffic4%
Lanes On Bridge5
Lanes Under Bridge8

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number121020072003063

Nearby Bridges