U.s. Highway 6 over Spring Canyon Ck Channel

Good Condition24 years old2,060 vehicles/day

Location

StateCalifornia
CountyMono
Location09-mno-006-r17.96
CarriesU.s. Highway 6
CrossesSpring Canyon Ck Channel
Coordinates37.71297, -118.42959

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length144.4 ft (44 m)
Max Span41.0 ft (12.5 m)
Deck Width43.0 ft (13.1 m)
Deck Area576.4 sq m
Main Spans4
Year Built2002

Traffic

Avg Daily Traffic2,060 (2020)
Truck Traffic23%
Lanes On Bridge2

Inspection & Ownership

Last Inspection924
Inspection FrequencyEvery 48 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number47 0062