Bw 8 over Hardy Toll RD & Uprr
Fair Condition58 years old113,979 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 2.0 Mi E Of IH 45 |
| Carries | Bw 8 |
| Crosses | Hardy Toll RD & Uprr |
| Coordinates | 29.93876, -95.38134 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 1359.9 ft (414.5 m) |
| Max Span | 125.0 ft (38.1 m) |
| Deck Width | 141.1 ft (43 m) |
| Deck Area | 17823.5 sq m |
| Main Spans | 1 |
| Year Built | 1968 (reconstructed 2016) |
Traffic
| Avg Daily Traffic | 113,979 (2023) |
| Truck Traffic | 9% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 18 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 121020325602004 |