Bw 8 Kirby Ramp over Natural Ground
Good Condition7 years old8,000 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | Inter Of SH 288 & Bw 8 |
| Carries | Bw 8 Kirby Ramp |
| Crosses | Natural Ground |
| Coordinates | 29.59757, -95.38897 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 533.1 ft (162.5 m) |
| Max Span | 107.0 ft (32.6 m) |
| Deck Width | 26.9 ft (8.2 m) |
| Deck Area | 1332.5 sq m |
| Main Spans | 5 |
| Year Built | 2019 |
Traffic
| Avg Daily Traffic | 8,000 (2012) |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | December 2022 |
| Inspection Frequency | Every 48 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 121020325604509 |