Bay Area BLVD EB over Hcfcd Ditch

Fair Condition58 years old5,470 vehicles/day

Location

StateTexas
CountyHarris
Location0.9 Mi W Of Red Bluff Rd.
CarriesBay Area BLVD EB
CrossesHcfcd Ditch
Coordinates29.59761, -95.08466

Condition Ratings

Overall ConditionFair
Deck8 (Very Good)
Superstructure6 (Satisfactory)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignOther
Total Length86.0 ft (26.2 m)
Max Span27.9 ft (8.5 m)
Deck Width34.1 ft (10.4 m)
Deck Area272.5 sq m
Main Spans3
Year Built1968 (reconstructed 1985)

Traffic

Avg Daily Traffic5,470 (2009)
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2023
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number121020AA3166005

Nearby Bridges