Misty Summit DR over Hcfcd Ditch
Good Condition32 years old250 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 0.15 Mi N Of Canyon Way |
| Carries | Misty Summit DR |
| Crosses | Hcfcd Ditch |
| Coordinates | 29.93519, -95.48748 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 7 — Countermeasures installed |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 75.1 ft (22.9 m) |
| Max Span | 24.9 ft (7.6 m) |
| Deck Width | 41.0 ft (12.5 m) |
| Deck Area | 286.2 sq m |
| Main Spans | 3 |
| Year Built | 1994 |
Traffic
| Avg Daily Traffic | 250 (2015) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 121020AA9435001 |