Eldridge PKWY NB over Hcfcd Ditch

Good Condition40 years old6,077 vehicles/day

Location

StateTexas
CountyHarris
Location3.10 Mi S Of Westheimer
CarriesEldridge PKWY NB
CrossesHcfcd Ditch
Coordinates29.69186, -95.62229

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway6 (Satisfactory)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length91.9 ft (28 m)
Max Span29.9 ft (9.1 m)
Deck Width34.1 ft (10.4 m)
Deck Area291.2 sq m
Main Spans3
Year Built1986

Traffic

Avg Daily Traffic6,077 (2020)
Lanes On Bridge2

Inspection & Ownership

Last Inspection923
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number121020AA9648005

Nearby Bridges