Clay RD over Hcfcd Ditch

Fair Condition41 years old4,870 vehicles/day

Location

StateTexas
CountyHarris
Location0.05 Mi E Of Blalock RD
CarriesClay RD
CrossesHcfcd Ditch
Coordinates29.83258, -95.52299

Condition Ratings

Overall ConditionFair
Channel/Waterway7 (Good)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length26.9 ft (8.2 m)
Max Span12.1 ft (3.7 m)
Deck Area119.7 sq m
Main Spans2
Year Built1985

Traffic

Avg Daily Traffic4,870 (2013)
Lanes On Bridge4

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number121020B14885005

Nearby Bridges