Fondren RD SB over Hcfcd Ditch
Fair Condition54 years old8,000 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 0.20 Mi S Of W Airpirt |
| Carries | Fondren RD SB |
| Crosses | Hcfcd Ditch |
| Coordinates | 29.64194, -95.50843 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 107.9 ft (32.9 m) |
| Max Span | 36.1 ft (11 m) |
| Deck Width | 32.5 ft (9.9 m) |
| Deck Area | 325.7 sq m |
| Main Spans | 3 |
| Year Built | 1972 (reconstructed 1988) |
Traffic
| Avg Daily Traffic | 8,000 (2014) |
| Truck Traffic | 5% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 121020B24809015 |