Fuqua ST EB over Hcfcd A120-03-00
Fair Condition46 years old8,115 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 0.1 Mi W Of Beamer |
| Carries | Fuqua ST EB |
| Crosses | Hcfcd A120-03-00 |
| Coordinates | 29.61133, -95.23040 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 58.1 ft (17.7 m) |
| Max Span | 56.1 ft (17.1 m) |
| Deck Width | 33.8 ft (10.3 m) |
| Deck Area | 182.3 sq m |
| Main Spans | 1 |
| Year Built | 1980 |
Traffic
| Avg Daily Traffic | 8,115 (2011) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 121020B25897644 |