San Felipe RD over Hcfcd Ditch

Good Condition13 years old26,478 vehicles/day

Location

StateTexas
CountyHarris
Location0.50 Mi E Of IH 610
CarriesSan Felipe RD
CrossesHcfcd Ditch
Coordinates29.74665, -95.44843

Condition Ratings

Overall ConditionGood
Channel/Waterway8 (Very Good)
Culvert7 (Good)
Scour Critical7 — Countermeasures installed

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length25.9 ft (7.9 m)
Max Span12.1 ft (3.7 m)
Deck Area115.3 sq m
Main Spans2
Year Built2013

Traffic

Avg Daily Traffic26,478 (2013)
Truck Traffic5%
Lanes On Bridge4

Inspection & Ownership

Last InspectionOctober 2023
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number121020B57009150

Nearby Bridges