Westpark Tollway over Hcfcd Ditch 132-00-0
Fair Condition21 years old10,000 vehicles/day
Location
| State | Texas |
| County | Harris |
| Location | 0.50 Mi W Of SH 6 |
| Carries | Westpark Tollway |
| Crosses | Hcfcd Ditch 132-00-0 |
| Coordinates | 29.71036, -95.65202 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 169.9 ft (51.8 m) |
| Max Span | 57.1 ft (17.4 m) |
| Deck Width | 81.0 ft (24.7 m) |
| Deck Area | 1279.5 sq m |
| Main Spans | 3 |
| Year Built | 2005 |
Traffic
| Avg Daily Traffic | 10,000 (2009) |
| Truck Traffic | 5% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 121020TOL030034 |