US 183/us 77a over 12 Mile Coleto Crk

Good Condition87 years old1,564 vehicles/day

Location

StateTexas
CountyDeWitt
Location9.21 Mi S Of FM 2718
CarriesUS 183/us 77a
Crosses12 Mile Coleto Crk
Coordinates28.92581, -97.34446

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway6 (Satisfactory)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length160.1 ft (48.8 m)
Max Span40.0 ft (12.2 m)
Deck Width45.9 ft (14 m)
Deck Area683.2 sq m
Main Spans4
Year Built1939 (reconstructed 1996)

Traffic

Avg Daily Traffic1,564 (2023)
Truck Traffic19%
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number130620015501015

Nearby Bridges