Co93-speedway BLVD over I-20

Fair Condition61 years old3,261 vehicles/day

Location

StateAlabama
CountyTalladega
LocationExit 173 (eastaboga)
CarriesCo93-speedway BLVD
CrossesI-20
Coordinates33.58132, -86.02378

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialConcrete Continuous
DesignTee Beam
Total Length266.1 ft (81.1 m)
Max Span73.2 ft (22.3 m)
Deck Width26.9 ft (8.2 m)
Deck Area665.0 sq m
Main Spans4
Year Built1965

Traffic

Avg Daily Traffic3,261 (2022)
Truck Traffic10%
Lanes On Bridge2
Lanes Under Bridge6

Inspection & Ownership

Last Inspection723
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number008546

Nearby Bridges