US 59 NB over Navidad Riv. East Relief
Good Condition50 years old11,648 vehicles/day
Location
| State | Texas |
| County | Jackson |
| Location | 2.67 Mi SW Of FM 710 |
| Carries | US 59 NB |
| Crosses | Navidad Riv. East Relief |
| Coordinates | 29.02626, -96.55036 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 120.1 ft (36.6 m) |
| Max Span | 40.0 ft (12.2 m) |
| Deck Width | 44.3 ft (13.5 m) |
| Deck Area | 494.1 sq m |
| Main Spans | 3 |
| Year Built | 1976 |
Traffic
| Avg Daily Traffic | 11,648 (2020) |
| Truck Traffic | 17% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 131210008904191 |