Co RD 319 over West Mustang Creek
Good Condition26 years old26 vehicles/day
Location
| State | Texas |
| County | Wharton |
| Location | 3.09 Mi N Of Loop 523 |
| Carries | Co RD 319 |
| Crosses | West Mustang Creek |
| Coordinates | 29.15457, -96.42249 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 105.0 ft (32 m) |
| Max Span | 49.9 ft (15.2 m) |
| Deck Width | 27.9 ft (8.5 m) |
| Deck Area | 272 sq m |
| Main Spans | 2 |
| Year Built | 2000 |
Traffic
| Avg Daily Traffic | 26 (2022) |
| Truck Traffic | 3% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 132410AA0507001 |