CR 409 over San Fernando Creek
Fair Condition91 years old27 vehicles/day
Location
| State | Texas |
| County | Llano |
| Location | 4.0 Mi SW Of SH 71 |
| Carries | CR 409 |
| Crosses | San Fernando Creek |
| Coordinates | 30.83036, -98.88557 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 29.9 ft (9.1 m) |
| Max Span | 28.9 ft (8.8 m) |
| Deck Width | 16.1 ft (4.9 m) |
| Deck Area | 44.6 sq m |
| Main Spans | 1 |
| Year Built | 1935 |
Traffic
| Avg Daily Traffic | 27 (2020) |
| Truck Traffic | 3% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 141500AA0574001 |