IH 35 NB over Cesar Chavez (e 1st St)
Fair Condition64 years old129,685 vehicles/day
Location
| State | Texas |
| County | Travis |
| Location | 5.85 Mi S Of US 183 |
| Carries | IH 35 NB |
| Crosses | Cesar Chavez (e 1st St) |
| Coordinates | 30.26136, -97.73613 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 336.0 ft (102.4 m) |
| Max Span | 75.1 ft (22.9 m) |
| Deck Width | 49.2 ft (15 m) |
| Deck Area | 1,536 sq m |
| Main Spans | 1 |
| Year Built | 1962 |
Traffic
| Avg Daily Traffic | 129,685 (2020) |
| Truck Traffic | 10% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 142270001513380 |