Lp343/cesar Chavez over Shoal Creek

Fair Condition92 years old36,115 vehicles/day

Location

StateTexas
CountyTravis
Location1.0 Mi W Of IH 35
CarriesLp343/cesar Chavez
CrossesShoal Creek
Coordinates30.26524, -97.75121

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure7 (Good)
Channel/Waterway6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete Continuous
DesignTee Beam
Total Length146.0 ft (44.5 m)
Max Span60.0 ft (18.3 m)
Deck Width72.5 ft (22.1 m)
Deck Area983.5 sq m
Main Spans3
Year Built1934

Traffic

Avg Daily Traffic36,115 (2023)
Truck Traffic1%
Lanes On Bridge5

Inspection & Ownership

Last Inspection224
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number142270011312090

Nearby Bridges