Lp 1 NB On Ramp over Natural Ground
Fair Condition55 years old8,163 vehicles/day
Location
| State | Texas |
| County | Travis |
| Location | 3.30 Mi S Of US 183 |
| Carries | Lp 1 NB On Ramp |
| Crosses | Natural Ground |
| Coordinates | 30.33456, -97.75487 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 245.1 ft (74.7 m) |
| Max Span | 44.9 ft (13.7 m) |
| Deck Width | 26.6 ft (8.1 m) |
| Deck Area | 605.1 sq m |
| Main Spans | 6 |
| Year Built | 1971 |
Traffic
| Avg Daily Traffic | 8,163 (2023) |
| Truck Traffic | 2% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 142270313601021 |