Manor Street NB over Carrier Canal
Good Condition68 years old7,763 vehicles/day
Location
| State | California |
| County | Kern |
| Location | 0.3 Mi N Of Columbus AVE |
| Carries | Manor Street NB |
| Crosses | Carrier Canal |
| Coordinates | 35.40187, -119.00515 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 75.1 ft (22.9 m) |
| Max Span | 24.0 ft (7.3 m) |
| Deck Width | 39.7 ft (12.1 m) |
| Deck Area | 277.1 sq m |
| Main Spans | 3 |
| Year Built | 1958 |
Traffic
| Avg Daily Traffic | 7,763 (2010) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 50C0020R |