Timothy DR over Drainage Ditch
Good Condition12 years old204 vehicles/day
Location
| State | Texas |
| County | Williamson |
| Location | 0.02 Mi W Of Forest Ridge |
| Carries | Timothy DR |
| Crosses | Drainage Ditch |
| Coordinates | 30.51994, -97.62159 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 7 (Good) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 46.9 ft (14.3 m) |
| Max Span | 5.9 ft (1.8 m) |
| Deck Width | 76.1 ft (23.2 m) |
| Deck Area | 331.8 sq m |
| Main Spans | 6 |
| Year Built | 2014 |
Traffic
| Avg Daily Traffic | 204 (2020) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 142460KM3066001 |