183a SB over Hero Way BLVD
Good Condition14 years old35,207 vehicles/day
Location
| State | Texas |
| County | Williamson |
| Location | 4.2 Mi N Of FM 1431 |
| Carries | 183a SB |
| Crosses | Hero Way BLVD |
| Coordinates | 30.58731, -97.83954 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 274.9 ft (83.8 m) |
| Max Span | 125.0 ft (38.1 m) |
| Deck Width | 69.9 ft (21.3 m) |
| Deck Area | 1784.9 sq m |
| Main Spans | 1 |
| Year Built | 2012 (reconstructed 2023) |
Traffic
| Avg Daily Traffic | 35,207 (2011) |
| Truck Traffic | 5% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 7 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 48 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 142460T00183037 |