Hollister AVE over Maria Ygnacio Creek
Good Condition62 years old3,239 vehicles/day
Location
| State | California |
| County | Santa Barbara |
| Location | 0.12 Mi E Patterson AVE |
| Carries | Hollister AVE |
| Crosses | Maria Ygnacio Creek |
| Coordinates | 34.43481, -119.80717 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 64.0 ft (19.5 m) |
| Max Span | 63.0 ft (19.2 m) |
| Deck Width | 104.0 ft (31.7 m) |
| Deck Area | 618.1 sq m |
| Main Spans | 1 |
| Year Built | 1964 (reconstructed 1981) |
Traffic
| Avg Daily Traffic | 3,239 (2008) |
| Truck Traffic | 5% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 321 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 51C0026 |