Hollister Avenue over San Pedro Creek
Good Condition31 years old18,211 vehicles/day
Location
| State | California |
| County | Santa Barbara |
| Location | 0.05 Mi W Fairview AVE |
| Carries | Hollister Avenue |
| Crosses | San Pedro Creek |
| Coordinates | 34.43543, -119.83194 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 82.0 ft (25 m) |
| Max Span | 41.0 ft (12.5 m) |
| Deck Width | 102.0 ft (31.1 m) |
| Deck Area | 777.5 sq m |
| Main Spans | 2 |
| Year Built | 1995 |
Traffic
| Avg Daily Traffic | 18,211 (2003) |
| Truck Traffic | 8% |
| Lanes On Bridge | 7 |
Inspection & Ownership
| Last Inspection | 822 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 51C0131 |