Carpinteria AVE over Franklin Creek
Fair Condition49 years old8,024 vehicles/day
Location
| State | California |
| County | Santa Barbara |
| Location | 0.1 Mi W Of Holly AVE |
| Carries | Carpinteria AVE |
| Crosses | Franklin Creek |
| Coordinates | 34.40129, -119.52194 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Tee Beam |
| Total Length | 62.0 ft (18.9 m) |
| Max Span | 58.1 ft (17.7 m) |
| Deck Width | 77.1 ft (23.5 m) |
| Deck Area | 444.1 sq m |
| Main Spans | 1 |
| Year Built | 1977 |
Traffic
| Avg Daily Traffic | 8,024 (2011) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 51C0142 |