SH 239 over Jones Hollow
Good Condition79 years old2,528 vehicles/day
Location
| State | Texas |
| County | Goliad |
| Location | 7.6 Mi NW Of US 59 |
| Carries | SH 239 |
| Crosses | Jones Hollow |
| Coordinates | 28.70918, -97.52466 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 35.1 ft (10.7 m) |
| Max Span | 7.9 ft (2.4 m) |
| Deck Width | 65.3 ft (19.9 m) |
| Deck Area | 212.9 sq m |
| Main Spans | 4 |
| Year Built | 1947 (reconstructed 2001) |
Traffic
| Avg Daily Traffic | 2,528 (2020) |
| Truck Traffic | 32% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 160890051602006 |