US 281 over Chiltipin Creek Relief
Fair Condition95 years old9,525 vehicles/day
Location
| State | Texas |
| County | Jim Wells |
| Location | 1.5 Mi N Jct Bus 281 |
| Carries | US 281 |
| Crosses | Chiltipin Creek Relief |
| Coordinates | 27.80876, -98.08411 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 53.1 ft (16.2 m) |
| Max Span | 7.9 ft (2.4 m) |
| Deck Area | 375.8 sq m |
| Main Spans | 6 |
| Year Built | 1931 (reconstructed 1993) |
Traffic
| Avg Daily Traffic | 9,525 (2020) |
| Truck Traffic | 34% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 161260025403026 |